Production launch
NO-GO
F071 · data reliability
Tracks provider failover, stale/delayed/live labels, historical pagination and realtime reconnect evidence.
Production launch
NO-GO
Scope
F071 report
Blocked phases
1
Warning phases
0
F071
Provider failover, stale/delayed/live labels, historical pagination and realtime reconnect still require live backend fixtures.
Provider failover
No provider failover endpoint/evidence has been executed from this frontend batch.
Stale/delayed/live labels
F046 transparency exists; real fixture screenshots are required.
Realtime reconnect
Runtime guard exists; live socket load/reconnect QA is still required.
Frontend green gate
Run pnpm install/typecheck/lint/build/test/dev/test:e2e in local or staging.
Backend green gate
Run npm ci, prisma generate/validate, typecheck, lint, test, start/dev and migration check.
Browser/embed QA
Plain HTML, Next.js, WordPress-like, mobile, multi-widget and no-token checks require real browser evidence.
Security/observability evidence
Token redaction, CSP, iframe sandbox, postMessage allowlist and trace id propagation must be proven.
Release/docs evidence
Customer install guides, troubleshooting, known limitations and rollback docs need final review.
Run F066-F075 as a production-track readiness/handoff, then collect real local/staging frontend, backend and browser evidence before RC1 or production launch.